PRIVATE EXECUTIVE DINNER

Delivering AI-Ready Data Centres
– How Long is Too Long? 

16 September, 18:00 - 21:00 | Fogo de Chão Bishopsgate, London

Register Your Interest

In association with

Executive roundtable meetingData centre infrastructureBusiness conference audience

An invitation-only executive roundtable by Data Centre Magazine, in association with Aggreko


The rapid growth of AI is driving unprecedented demand for AI-ready data centres, placing increasing pressure on power infrastructure, cooling systems and deployment timelines. As hyperscale expansion accelerates and enterprise AI adoption grows, data centre operators face mounting challenges around grid capacity, energy availability, engineering resources and infrastructure delivery.


Hosted by Data Centre Magazine in association with Aggreko, this exclusive executive roundtable will bring together senior leaders from across the data centre industry to discuss how organisations can accelerate AI infrastructure deployment while maintaining resilience, reliability and operational performance.


The discussion will examine practical approaches to overcoming grid constraints, deploying flexible on-site energy, integrating advanced cooling technologies, and accelerating the delivery of AI-ready data centre capacity. Attendees will gain peer-led insights into how leading organisations are addressing rising infrastructure demands and positioning themselves for next-generation AI workloads.

Register Your Interest

What the Conversation Will Explore

Infrastructure

The widening gap between AI-driven demands and the readiness of critical infrastructure for keeping sites online

Grid Constraints

Grid permitting and connection delays preventing rapid data centre scaling

Integrated Systems

The challenge of integrating power and cooling as interdependent systems

Liquid Cooling Strategies

The increased operational risk and complexity from high-density, liquid-cooled environments

Bridging Strategies

Lack of clear frameworks for deploying bridging solutions that maintain uptime and delivery schedules

Exclusive Benefits for Attendees

01

Invitation-only access to a closed-door discussion with senior industry peers

02

Direct engagement with expert perspectives and real-world use cases

03

Opportunity to shape industry thinking and future content
(e.g. whitepapers, insights)

04

Visibility through post-event content and thought leadership outputs

Agenda

18:00

Guest arrival, introduction from Aggreko spokesperson

18:30

Guest introductions, agenda overview, editor’s perspective on the topic

19:00

Open floor discussion with chair moderation: The Infrastructure/Reality Gap

19:30

Open floor discussion with chair moderation: Power and Cooling in the AI Era

20.00

Open floor discussion with chair moderation: How to Accelerate and Scale Delivery

20:45

Closing remarks and discussion summary

21:00

Roundtable concludes

Register Your Interest

FOGO DE CHÃO BISHOPSGATE

100 Bishopsgate, London EC2M 1GT, United Kingdom

From drinks and canapé receptions to the full Brazilian steakhouse experience, our Relationships & Events Managers are on hand to ensure the highest level of detail and service is delivered. An elegant Brazilian dining experience presented by our helpful and knowledgeable team will make Fogo de Chão the perfect location for your group, private dining or canapé event.

Register Your Interest

Gain practical insights from industry leaders, explore proven strategies for delivering AI-ready infrastructure, and leave with actionable approaches to accelerating power and cooling deployment at scale

By registering your interest, you agree to our Terms of Use and receiving editorial updates from DataCentre Magazine. Unsubscribe anytime. Privacy Policy.

In association with